Gas Processing & Treatment Projects
Wapiti Gas Processing (200 MMscfd)
Equinox Projects Wapiti Gas Processing (200 MMscfd) Project Summary: Equinox successfully executed the FEED and Detail Design of the SemCAMS Wapiti Gas Plant under budget…
Pipestone Liquids Hub
Equinox Projects Pipestone Liquids Hub Project Summary: Equinox Engineering delivered the Pipestone Liquids Hub project 10% under budget, and 2 months ahead of schedule. This…
400 MMscfd Advantage Glacier Amine Plant
Equinox Projects 400 MMscfd Advantage Glacier Amine Plant Project Summary: The Advantage Glacier Gas Plant expansion project increased the overall processing capacity of the facility…
Kakwa Sour Gas Plant (200 MMscfd)
Equinox Projects Kakwa Sour Gas Plant (200 MMscfd) Project Summary: Equinox executed the FEED, Detail Design, installation, and commissioning of a large sour, deep-cut gas…
Simonette Gas Plant
Equinox Projects Simonette Gas Plant Project Summary: FEED and Detail Design and installation of 50 MMscfd expansion of the existing Simonette plant. The process train…
Dawson Sour Gas Plant (120 MMscfd)
Equinox Projects Dawson Sour Gas Plant (120 MMscfd) Project Summary: FEED and Detail Design for a sour gas plant with process trains (2 x 60…
Musreau Phase 1 Gas Plant (45 MMscfd)
Equinox Projects Musreau Phase 1 Gas Plant (45 MMscfd) Project Summary: FEED and Detail Design for a gas plant which includes inlet separation, condensate stabilization,…
Pouce South Sour Gas Plant (60 MMscfd)
Equinox Projects Pouce South Sour Gas Plant (60 MMscfd) Project Summary: FEED and Detail Design for a 2 process train gas plant containing inlet separation/slug…
Tooga Gas Plant (60 MMscfd)
Equinox Projects Tooga Gas Plant (60 MMscfd) Project Summary: Modular facility designed for remote transport and assembly. 60 MMscfd capability to handle inlet process gas…
West Doe Sour Gas Plant (100 MMscfd)
Equinox Projects West Doe Sour Gas Plant (100 MMscfd) Project Summary: FEED & Detail Design for a sour gas plant with three process trains totaling…
Pouce Coupe Sour Gas Plant (60 MMscfd)
Equinox Projects Pouce Coupe Sour Gas Plant (60 MMscfd) Project Summary: A modular facility designed for ease of transportation and remote assembly. 60 MMscfd capability…
THIOPAQ Bio-Desulphurization
Equinox Projects THIOPAQ Bio-Desulphurization Project Summary: We are the only Canadian EPCM, and one of few worldwide, with approval for detailed engineering design of sour…
Pembina DS3 Condensate Stabilization Facility
Equinox Projects Pembina DS3 Condensate Stabilization Facility Project Summary: Equinox Engineering recently executed the Detail Design of this 20,000 bpd Stabilization Facility in the Duvernay…
Tiger Rose Gas Processing Facility
Equinox Projects Tiger Rose Gas Processing Facility Project Summary: Equinox successfully executed the Conceptual Design and FEED of the Tiger Rose Facility in northern Alberta.…
15-30 Separation Facility
Equinox Projects 15-30 Separation Facility Project Summary: Equinox successfully executed the FEED and Detail Design of the Pipestone Separation Facility outside of Grande Prairie, Alberta.…