Equinox Engineering is an industry leader in power generation, specifically regarding gas turbine generators (GTG), waste heat recovery as well as co-generation.
Within the overall design of the Kakwa Gas Processing Complex (250 MMscfd facility), a significant amount of power generation was required.
With the Equinox scope, there were three gas turbine generators (Solar Turbine, Taurus 60 units). This included 18 MW of power generation, along with a Waste Heat Recovery Unit (WHRU) and two x 1.3 MW, 480V diesel backup gensets.
Equinox was responsible for the design and procurement of all gas turbine generators, along with enclosures, switchgear, transformers, MCCs as well as all other auxiliary equipment.
Equinox has designed and installed power generation at remote facility sites – ranging from 100 kW up to 60 MW.