Updates

Pipestone Separation Facility

November 13, 2019

Equinox successfully executed the FEED and Detail Design of the Pipestone Separation Facility outside of Grande Prairie, Alberta. The facility is designed to handle a maximum inlet of 260 MMscfd sour gas (8% H2S) and 40,000 bpd of sour emulsion (24,000 bpd of raw condensate and 16,000 bpd of produced water). Up to 2 m³/d of sand production is anticipated and to be separated from the bulk process.

Major equipment includes:
• 2 x 50% two-phase inlet separator packages
• slurry tank with circulation pump, skim oil pump and jet water pump
• produced emulsion booster pump package (2 x 100% pumps
• vapor recovery compressor package
• dual high-pressure and low-low-pressure flare stack
• high-pressure flare knock-out drum; MCC/HMI building package
• emergency generator and diesel storage
• 2 x 50% Emulsion/FG Line Heaters
• chemical Injection package

Project Updates

Inga Sour Gas Compressor Station Relocation and Amine Expansion

August 15, 2020

Equinox successfully executed a complete facility relocation and amine expansion of the...Read More

Project Updates

Montney Wellpad Development Program

July 27, 2020

Equinox successfully executed full engineering services and construction support for a ...Read More

Insights

Equinox Insights on CCUS

June 15, 2020

Reduction of CO2 Emissions An opportunity for many industries to reduce CO2 emissions f...Read More