Equinox successfully executed the FEED and Detail Design of the Pipestone Separation Facility outside of Grande Prairie, Alberta. The facility is designed to handle a maximum inlet of 260 MMscfd sour gas (8% H2S) and 40,000 bpd of sour emulsion (24,000 bpd of raw condensate and 16,000 bpd of produced water). Up to 2 m³/d of sand production is anticipated and to be separated from the bulk process.

Major equipment includes:
• 2 x 50% two-phase inlet separator packages
• slurry tank with circulation pump, skim oil pump and jet water pump
• produced emulsion booster pump package (2 x 100% pumps
• vapor recovery compressor package
• dual high-pressure and low-low-pressure flare stack
• high-pressure flare knock-out drum; MCC/HMI building package
• emergency generator and diesel storage
• 2 x 50% Emulsion/FG Line Heaters
• chemical Injection package

Insights

Water Treatment and Handling Experts

November 26, 2019

Equinox has industry leading expertise in engineering design and installation of frac w...Read More

Project Updates

Pipestone Separation Facility

November 13, 2019

Equinox successfully executed the FEED and Detail Design of the Pipestone Separation Fa...Read More

Project Updates

SemCAMS Wapiti Gas Plant

October 29, 2019

Equinox successfully executed the FEED and Detail Design of the SemCAMS Wapiti Gas Plan...Read More