Equinox recently completed the FEED and Detail Design for the Nest Three Trunk Lines Project located between Grande Prairie and Grande Cache, Alberta.

The addition of the 23 km (15 mile) pipeline system is an extension of our Client's infrastructure that delivers sales gas and condensate to the market. It includes the design and installation of several 6” to 24” pipelines (water, sour gas, sweet gas, lift gas, oil emulsion) with two massive HDDs (2 km x 36” ream and 1.2 km x 42” ream) for major river/creek crossing.

The project was completed in four phases to tie-in well pad satellites to the Client's existing pipeline network:

• Phase 1: 7 km x 24" sales gas pipeline; 7 km x 8" condensation pipeline; 7 km x 8" water line

• Phase 2: 6 km x 20" sales gas pipeline; 6 km x 8" condensate pipeline; 6 km x 8" water line

• Phase 3: from a super pad, 4 km x 16" sales gas pipeline; 4 km x 12" gas gathering pipeline; 4 km x 8" condensate pipeline; 4 km x 6" lift gas pipeline; 4 km x 8" water line

• Phase 4: 7 km x 16" sales gas pipeline; 7 km x 8" gas gathering pipeline; 7 km x 8" condensate pipeline; 7 km x 8" water line

Equinox's Pipeline Group has installed thousands of kilometers of gathering systems, trunk and group lines. Learn more about our expertise or get in touch today.

Insights

Water Treatment and Handling Experts

November 26, 2019

Equinox has industry leading expertise in engineering design and installation of frac w...Read More

Project Updates

Pipestone Separation Facility

November 13, 2019

Equinox successfully executed the FEED and Detail Design of the Pipestone Separation Fa...Read More

Project Updates

SemCAMS Wapiti Gas Plant

October 29, 2019

Equinox successfully executed the FEED and Detail Design of the SemCAMS Wapiti Gas Plan...Read More