eq-admin

Moomba Carbon Capture FEED

Moomba Gas Processing - Carbon Capture and Sequestration FEED (2020/2021)

Moomba Carbon Capture FEED Client: Santos Location: Southern Australia Project Summary: Following the successful Concept Study and PreFEED phases, Equinox successfully executed the FEED stage of the Carbon Capture & Storage (CCS) project for Santos. Based on capital installation costs, operation expenses, and historical process experience, Equinox recommended recovering CO2 from the Moomba facility (Train …

Moomba Carbon Capture FEED Read More »

Hydrogen Power Generation

Hydrogen Power Generation

Hydrogen Power Generation Client: Confidential Client Location: Western Canada Project Summary: Equinox conducted an engineering and economic study for a hydrogen production project. The project included the feasibility of designing and constructing hydrogen production facilities in central Alberta, Canada to produce 2,000 kg/day of hydrogen, utilizing a raw sweet gas feed product. The project also …

Hydrogen Power Generation Read More »

Duvernay Hydrogen Production

Duvernay Hydrogen Production Production, Carbon Capture and Enhanced Oil Recovery

Duvernay Hydrogen Production Client: Confidential Client Location: Western Canada Project Summary: Equinox conducted an engineering and economic study for a hydrogen fuels project. The project included the conversion of inlet methane gas to a hydrogen product. The hydrogen plant captures 200,000 mtpa of carbon dioxide for Enhanced Oil Recovery. Produced hydrogen volumes of 50 tons …

Duvernay Hydrogen Production Read More »

Power Plant – Carbon Capture, Transportation and Sequestration (1.7 mtpa)

Hannibal Power Plant Carbon Capture, Transportation and Sequestration

Power Plant – Carbon Capture, Transportation and Sequestration (1.7 mtpa) Client: Long Ridge Energy Location: Ohio, USA Project Summary: Equinox delivered this Conceptual Study for existing Gas Turbine Power Generation Facility treating 1.7 Bcf of exhaust gas to recover 76 MMscfd of 96% CO2. The new facility will capture 1.6 mtpa of CO2, utilizing a …

Power Plant – Carbon Capture, Transportation and Sequestration (1.7 mtpa) Read More »

Northern Territory CO2 Pipeline

Northern Territory CO2 Pipeline

Northern Territory CO2 Pipeline Client: Confidential Client Location: Northern Australia Project Summary: Equinox conducted an engineering and economic study for a large CO2 Pipeline project, which envisions a 390 mi (625 km) long, dense phase CO2 pipeline through the Northern Territory. The pipeline mainline diameter options include 10”, 24”, and 32”diameter pipeline. Associated facilities include …

Northern Territory CO2 Pipeline Read More »

Beetaloo Decarbonisation Plan

Beetaloo Decarbonisation Plan Hydrogen Power Generation and Co2 Sequestration

Beetaloo Decarbonisation Plan Client: Confidential Client Location: Northern Australia Project Summary: Equinox conducted an engineering and economic study for a Decarbonization Plan regarding a Northern Territory development program for a 1,000+ MMscfd field. Numerous emission reduction strategies were identified for the planned program of natural gas infrastructure development. This included carbon reduction initiatives for each …

Beetaloo Decarbonisation Plan Read More »

Carbon Capture Technology Evaluation

Carbon Capture Technology Evaluation

Carbon Capture Technology Evaluation Client: Confidential Client Location: Western Canada Project Summary: Equinox delivered an in-depth technology review of 15 carbon capture technologies for suitability in a post-combustion capture scheme for a large fractionation facility. The study evaluated various technologies against cases for two flowrates, and three gas compositions. The various Technology Licensors provided CO2 …

Carbon Capture Technology Evaluation Read More »

Fractionation Plant – Carbon Capture (0.3 to 0.5 mtpa)

Fractionation Plant Carbon Capture

Fractionation PlantCarbon Capture (0.3 to 0.5 mtpa) Client: Confidential Client Location: Western Canada Project Summary: Equinox provided engineering and economic evaluations to reduce carbon emissions of one of Canada’s largest (210,000 bpd) fractionation facilities. The Carbon Capture system would treat flue gas generated by the facility’s Cogeneration unit, and two natural gas fired heaters, which …

Fractionation Plant – Carbon Capture (0.3 to 0.5 mtpa) Read More »

Power Plant – Carbon Capture, Transportation and Sequestration (1.7 mtpa)

Shepard Power Plant Carbon Capture, Transportation and Sequestration

Power Plant – Carbon Capture, Transportation and Sequestration (1.7 mtpa) Client: Confidential Client Location: Western Canada Project Summary: To reduce carbon emissions of an 880 MW natural gas driven power plant, Equinox provided engineering and economic evaluations to implement an amine-based CO2 capture (approximately 1.7 mtpa of CO2), with CO2 compression and dehydration to deliver …

Power Plant – Carbon Capture, Transportation and Sequestration (1.7 mtpa) Read More »

Moomba Cross Border CO2 Pipeline​

Moomba Cross Border CO2 Pipeline​

Moomba Cross Border CO2 Pipeline Client: Santos Location: Southern Australia Project Summary: Equinox is currently executing Detail Design of the Moomba CCS – CO2 Pipeline project, which consists of a 31 mi (50 km), 10” pipeline and associated facilities in South Australia. Facilities include offtake locations, vents, MLVs, pigging as well as several injection wellsites. …

Moomba Cross Border CO2 Pipeline​ Read More »