Duvernay Stabilization 3
Equinox Engineering recently executed the Detail Design of this 20,000 bpd Stabilization Facility in the Duvernay area of Fox Creek, Alberta. The facility is now in construction. The Duvernay Stabilization 3 (DS3) includes the addition of a third stabilization train sized for 20,000 bpd with additional storage (1 x 15,000 bbl tank). The project accounted …