Equinox Projects

Northern Territory CO2 Pipeline

Northern Territory CO2 Pipeline

Client:

Confidential Client

Location:

Northern Australia

Project Summary:

Equinox conducted an engineering and economic study for a large CO2 Pipeline project, which envisions a 625 km long, dense phase CO2 pipeline through the Northern Territory. The pipeline mainline diameter options include 10”, 24”, and 32”diameter pipeline. Associated facilities include intermediate pump stations, offtake locations, vents, MLVs, pigging / scraper sending and receiving, as well as sequestration wellsites.

Overview:

  • 625 km CO2 pipeline
  • DN 250 / DN 600 / DN 800 diameters
  • Intermediate pump stations
  • Sequestration wellsites
  • Offtake locations
  • Vents, Main Line Valves
  • Pigging / scraper facilities

Scope of Work:

  • Conceptual Study Engineering
  • Pipeline Engineering
  • Engineering Drawing Packages
  • Material Selection
  • Fracture Control Plan
  • Corrosion & Mitigation Plan
  • Leak Detection program
  • Safety Workshops
  • Process simulations, hydraulics
  • CAPEX, OPEX Estimating

Equinox conducted an engineering and economic study for a large CO2 Pipeline project, which envisions a 625 km long, dense phase CO2 pipeline through the Northern Territory.